DPW Project Engineer Michael J. Mahoney Projects 20-Year Traffic Capacity Without Full Interchange as Town Seeks Additional Engineer
NORWOOD – Proposed state highway alterations at the intersection of Route 1 and Everett Street would safely accommodate local traffic flows for more than two decades—even with Polaroid Corp. opening a major new industrial complex nearby—state Department of Public Works (DPW) project engineer Michael J. Mahoney assured town and county officials in November 1968. Reported in The Patriot Ledger on Tuesday, November 19, 1968, Mahoney outlined the state’s engineering blueprint during a Monday night public hearing convened by the Norwood Planning Board and attended by selectmen and Norfolk County commissioners.
The hearing stemmed from an $8,000 Town Meeting appropriation passed the previous spring authorizing the Planning Board and selectmen to commission a private traffic safety survey of the corridor, which prompted the state DPW to conduct its own parallel engineering study. Mahoney explained that the state’s Chapter 90 improvement project called for widening Everett Street between Route 1A and Route 1 from its existing 40-foot width to 60 feet—a contract slated to go out to bid within the year—in anticipation of heavy commuter traffic generated by Polaroid’s multi-million-dollar industrial campus then under construction on the former Forbes Estate, once home to former U.S. Ambassador to Japan W. Cameron Forbes.
At the Route 1 junction itself, Mahoney stated that state plans called for a minor land taking on the northwesterly corner of Everett Street and Route 1 to round off the access road onto the highway, relocating existing small traffic islands, and creating dedicated left-turn “loading lanes” on both sides of Route 1. Mahoney dismissed proposals for a full grade-separated highway interchange at Everett Street as unwarranted, noting current traffic stood at roughly 28,000 vehicles daily—less than half the volume required before the state would consider building an interchange. Even after being informed that Polaroid expected to employ at least 1,200 workers at its Norwood complex, Mahoney maintained that widening Everett Street and reconfiguring the intersection would remain adequate “until 1990.”
However, Mahoney identified a major physical bottleneck along the Everett Street corridor: the low railroad bridge spanning Everett Street near Route 1A, which offered just 10.6 feet of vertical clearance whereas heavy commercial trucks required nearly 14 feet. Achieving full truck clearance, he warned, would eventually require the town to lower the street grade beneath the span.
Separately during the session, Town Manager Walter A. Blasenak informed planners that his office would assist the board and the town engineering department in recruiting an additional municipal engineer to help ease the mounting workload on Town Engineer Robert A. Hamilton and his four-man staff. Blasenak noted that recruiting qualified engineers at Norwood’s existing pay scale had proven difficult, setting a minimum starting salary of $12,000 for the new hire and adding that bringing in an engineer at that rate could prompt an upward pay reclassification across the entire engineering department.
1968 Municipal Figures Adjusted to 2026 Dollars & Corridor Legacy
Inflation-adjusted using U.S. Bureau of Labor Statistics CPI data ($1.00 in Nov. 1968 ≈ $9.23 in 2026)
| 1968 Municipal Appropriation / Salary Item | 1968 Amount | 2026 Equivalent |
|---|---|---|
| Minimum Starting Salary for Additional Town Engineer | $12,000 / yr | ~$110,760 / yr |
| Town Meeting Traffic Safety Survey Appropriation | $8,000 | ~$73,840 |
Archival Note: This article has been dynamically reconstructed from the original public record print archives of the Patriot Ledger
More…
-
Businessman John P. Alevizos Willing to Pay for Walpole Street Traffic Lights-November 7, 1977

Tired of waiting for state action, shopping center developer John P. Alevizos has agreed to privately finance $60,000 in traffic signalization and road improvements at Walpole and Wilson Streets.
-
Uncertainty Looms Over Norwood Junior High South Opening Date-July 12, 1974

After three years of double sessions following a 1971 fire, Norwood officials faced the possibility of further delays for the new Junior High South.
-
Unfinished Junior High To Open On Schedule-July 8, 1974

Discover the construction history of the $4.5 million Junior High South project in 1974, detailing the challenges faced during the transition from the old Washington Street school.
-
Selectmen Authorize Water Main Connection and Space Transfers for Phased-Out Schools-June 26, 1974

Shaw Street Infrastructure Upgrades Approved While Winslow and Shattuck Buildings Repurposed for Town Services The Board of Selectmen enacted a series of municipal infrastructure and real estate management decisions during last night’s executive session. In a unanimous vote, selectmen approved a formal request to seek a $16,000 budget transfer from the Finance Commission to construct…
-
Norwood Board Weighs Alternatives For Two Lyman Place Houses-October 17, 1973

Rewritten Narrative Feature A Town Divided Over Municipal Property The future of two Lyman Place houses—purchased by Town Meeting for $25,000—remains completely unresolved following a tense and ultimately inconclusive joint meeting between the Board of Selectmen, the Youth Commission, and representatives from the Pulse hotline. Situated near the public works yard, the properties were initially…
-
Alandale Parkway Residents Demand Answers on Long-Delayed Street Acceptance-September 13, 1972

Alandale Parkway residents demand answers from Norwood selectmen regarding a decade-long delay in street acceptance and severe sidewalk deterioration.
-
$1.8 Million in Major Traffic and Safety Improvements Recommended-September 1, 1972

Comprehensive Traffic and Safety Overhaul Recommended for Norwood in Final Federal TOPICS Report A comprehensive and exhaustive final engineering report, recently delivered to local town selectmen, has outlined a sweeping, multi-faceted proposal to dramatically overhaul Norwood’s municipal road network, upgrade intersection safety, and alleviate escalating vehicular congestion throughout the community. Prepared by the prominent Chestnut…
-
Norwood Selectmen Approve Infrastructure Improvements for Upland Road-July 12, 1971

Local leaders also enacted emergency measures for the town dump to comply with state sanitary regulations and adjusted the 1971 tax rate through light department fund transfers.
Discover more from Norwood Historical Society
Subscribe to get the latest posts sent to your email.


