
The fate of the proposed University Avenue extension remains hanging in the balance as local officials wrestle with a high-stakes dilemma: balancing lucrative industrial expansion against the protection of Norwood’s vital backup water supply.
With a final decision resting in the hands of the county commissioners—who face a sharply divided town—the project has ignited a fierce debate between economic development proponents and environmental preservationists.
The Promise of Economic Growth and Public Safety
Supporters of the road extension argue that pushing University Avenue directly from Route 1 to the Star Market warehouse property offers undeniable municipal benefits:
- Emergency Response: Significantly cuts response times for fire and police vehicles.
- Industrial Traffic: Provides a direct, efficient route to Route 128 for commercial vehicles.
- Tax Revenue: Opens up the long-undeveloped Glacier Industrial Park and surrounding land between American Drive and the Star warehouse for commercial development. Officials estimate this land could generate up to $1 million in taxable property, rivaling the neighboring Westwood Industrial Park’s $1.2 million tax boon.
To address financial roadblocks, the Finance Commission recently approved $8,000 to explore the Ellis Avenue well field area to determine if new wells can offset any potential disruption.
Environmental Opposition and Water Protection Concerns
Despite the economic upside, the project faces stiff resistance from conservationists and health officials who fear compromising the town’s dormant water reserves:
- Health Board Objections: Health Agent Bartley J. King points out that a similar 1970 plan was blocked by the state Department of Health due to threatened well field damage, and argues the state’s successor agency under the Department of Environmental Quality Engineering holds the same view.
- Conservation Pushback: Conservation Commission Chairman Elizabeth Cottrell voiced strong skepticism, stating, “What we have heard we think is foolish… Even if they find more water, why ruin good water already there?”
Although the existing wells have been dormant since Norwood tied into the MDC water system in 1956, supporters like County Engineer Al Downs maintain the road can be built safely. Proponents’ revised plans involve relocating dormant wells further from the roadway, drilling new high-capacity gravel-packed wells, and engineering a specialized drainage system that diverts sewage to the MDC pipe and routes storm water downstream into Purgatory Brook, well below the well field.
Next Steps at the County Level
The three-member board of county commissioners, having already held one public hearing, plans to schedule a second session due to the intense local split. County Assistant Director of Operations Henry Ainsley noted the unique difficulty, observing, “Most of the time, the commissioners have a policy of generally complying with the wishes of the towns. But in this case the town is split, which makes it more difficult.”
Even if approved by the commissioners, the project will require special state legislation to permit public highway use on land currently restricted for public water purposes—providing opponents yet another opportunity to halt the extension.
Archival Note: This article has been dynamically reconstructed from the original public record print archives of the Patriot Ledger
More…
-
$1.8 Million in Major Traffic and Safety Improvements Recommended-September 1, 1972

Comprehensive Traffic and Safety Overhaul Recommended for Norwood in Final Federal TOPICS Report A comprehensive and exhaustive final engineering report, recently delivered to local town selectmen, has outlined a sweeping, multi-faceted proposal to dramatically overhaul Norwood’s municipal road network, upgrade intersection safety, and alleviate escalating vehicular congestion throughout the community. Prepared by the prominent Chestnut…
-
Norwood Selectmen Approve Infrastructure Improvements for Upland Road-July 12, 1971

Local leaders also enacted emergency measures for the town dump to comply with state sanitary regulations and adjusted the 1971 tax rate through light department fund transfers.
-
Selectmen Approve Upland Road and Clapboardtree Street Infrastructure Project-July 13, 1971

Local leaders also enacted emergency measures for the town dump to comply with state sanitary regulations and adjusted the 1971 tax rate through light department fund transfers.
-
Engineers Estimate $532,000 Cost for University Avenue Extension-September 4, 1970

A four-month overdue engineering study prepared by Boston-based consultants Fay, Spofford & Thorndike Inc. at a cost of $8,000 has placed an estimated price tag of $532,000 on the proposed 2,700-foot extension of University Avenue. The recommended roadway layout will connect the existing portion of University Avenue with Everett Street just before intersecting Route 1,…
-
Route 1 Median Guard Rail and Safety Construction Nearing December Completion-October 15, 1969

Crews install median guard rails and chain-link safety fencing along Route 1 across Norwood, Westwood, and Dedham, with a target completion date of December.
-
Norwood Kills Funds For School Addition-June 26, 1969

Voters approve a $1,000 Endean Park drainage compromise and reverse a zoning rule to relocate Carl A. Johnson’s Norwood Cadillac Co. along Route 1.
-
Norwood Voters To Consider Lighting Funds-June 26, 1968

The Finance Commission backs the utility expansion alongside a $163,000 sewer construction article, while the town master plan is deferred.
-
Industrial Commission Welcomes Star Service Hub-June 30, 1967

Following 50 intensive town meetings to resolve department regulations, developers project the new multi-million square foot industrial hub will lower Norwood’s local tax rate.
-
Ask Town Meeting on Industrial Park-September 7, 1966

Representatives of the development firm Cabot, Cabot & Forbes (CC&F) urged the Board of Selectmen last night to place an article before an early October special town meeting to pave the way for major infrastructure development at the Norwood Industrial Park. C. Brooks Dodge, representing CC&F, asked the board to initiate town meeting action and…
Discover more from Norwood Historical Society
Subscribe to get the latest posts sent to your email.








