The fate of the proposed University Avenue extension remains hanging in the balance as local officials wrestle with a high-stakes dilemma: balancing lucrative industrial expansion against the protection of Norwood’s vital backup water supply.

With a final decision resting in the hands of the county commissioners—who face a sharply divided town—the project has ignited a fierce debate between economic development proponents and environmental preservationists.

The Promise of Economic Growth and Public Safety

Supporters of the road extension argue that pushing University Avenue directly from Route 1 to the Star Market warehouse property offers undeniable municipal benefits:

  • Emergency Response: Significantly cuts response times for fire and police vehicles.
  • Industrial Traffic: Provides a direct, efficient route to Route 128 for commercial vehicles.
  • Tax Revenue: Opens up the long-undeveloped Glacier Industrial Park and surrounding land between American Drive and the Star warehouse for commercial development. Officials estimate this land could generate up to $1 million in taxable property, rivaling the neighboring Westwood Industrial Park’s $1.2 million tax boon.

To address financial roadblocks, the Finance Commission recently approved $8,000 to explore the Ellis Avenue well field area to determine if new wells can offset any potential disruption.

Environmental Opposition and Water Protection Concerns

Despite the economic upside, the project faces stiff resistance from conservationists and health officials who fear compromising the town’s dormant water reserves:

  • Health Board Objections: Health Agent Bartley J. King points out that a similar 1970 plan was blocked by the state Department of Health due to threatened well field damage, and argues the state’s successor agency under the Department of Environmental Quality Engineering holds the same view.
  • Conservation Pushback: Conservation Commission Chairman Elizabeth Cottrell voiced strong skepticism, stating, “What we have heard we think is foolish… Even if they find more water, why ruin good water already there?”

Although the existing wells have been dormant since Norwood tied into the MDC water system in 1956, supporters like County Engineer Al Downs maintain the road can be built safely. Proponents’ revised plans involve relocating dormant wells further from the roadway, drilling new high-capacity gravel-packed wells, and engineering a specialized drainage system that diverts sewage to the MDC pipe and routes storm water downstream into Purgatory Brook, well below the well field.

Next Steps at the County Level

The three-member board of county commissioners, having already held one public hearing, plans to schedule a second session due to the intense local split. County Assistant Director of Operations Henry Ainsley noted the unique difficulty, observing, “Most of the time, the commissioners have a policy of generally complying with the wishes of the towns. But in this case the town is split, which makes it more difficult.”

Even if approved by the commissioners, the project will require special state legislation to permit public highway use on land currently restricted for public water purposes—providing opponents yet another opportunity to halt the extension.

Archival Note: This article has been dynamically reconstructed from the original public record print archives of the Patriot Ledger

More…

  • Uncertainty Looms Over Norwood Junior High South Opening Date-July 12, 1974

    After three years of double sessions following a 1971 fire, Norwood officials faced the possibility of further delays for the new Junior High South.

  • Unfinished Junior High To Open On Schedule-July 8, 1974

    Discover the construction history of the $4.5 million Junior High South project in 1974, detailing the challenges faced during the transition from the old Washington Street school.

  • FinCom Summons James Capaldo in Garbage Contract Investigation-June 26, 1974

    A heated public trust battle deepens in Norwood as a plumbing inspector refuses to testify, forcing watchdogs to deploy full town charter powers. Categories: Town Government, Municipal Finance

    Three people reviewing municipal transportation contracts and documents in an office with filing cabinets and a map on the wall
  • Selectmen Authorize Water Main Connection and Space Transfers for Phased-Out Schools-June 26, 1974

    Shaw Street Infrastructure Upgrades Approved While Winslow and Shattuck Buildings Repurposed for Town Services The Board of Selectmen enacted a series of municipal infrastructure and real estate management decisions during last night’s executive session. In a unanimous vote, selectmen approved a formal request to seek a $16,000 budget transfer from the Finance Commission to construct…

  • Norwood Selectmen Delay Walpole Sewer Tie-In Amid Flooding Concerns and Scrutinize Police Logs-August 2, 1972

    The Norwood Board of Selectmen delayed a proposed Walpole sewer tie-in agreement over flooding concerns, while Selectman William F. Butters clashed with Police Chief James M. Murphy over police logs.

  • Norwood Selectmen Approve Infrastructure Improvements for Upland Road-July 12, 1971

    Local leaders also enacted emergency measures for the town dump to comply with state sanitary regulations and adjusted the 1971 tax rate through light department fund transfers.

  • Selectmen Approve Upland Road and Clapboardtree Street Infrastructure Project-July 13, 1971

    Local leaders also enacted emergency measures for the town dump to comply with state sanitary regulations and adjusted the 1971 tax rate through light department fund transfers.

  • Norwood Kills Funds For School Addition-June 26, 1969

    Voters approve a $1,000 Endean Park drainage compromise and reverse a zoning rule to relocate Carl A. Johnson’s Norwood Cadillac Co. along Route 1.

    Open ledger titled County Ledger 1969 with budget requests marked 'Budget Cut' and a judge's gavel on a wooden desk
  • Norwood Voters To Consider Lighting Funds-June 26, 1968

    The Finance Commission backs the utility expansion alongside a $163,000 sewer construction article, while the town master plan is deferred.

    Series of tall metal power transmission towers with electrical wires over fields and hills
  • Industrial Commission Welcomes Star Service Hub-June 30, 1967

    Following 50 intensive town meetings to resolve department regulations, developers project the new multi-million square foot industrial hub will lower Norwood’s local tax rate.


Discover more from Norwood Historical Society

Subscribe to get the latest posts sent to your email.

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.