In a meeting held on July 12, 1971, the Norwood Board of Selectmen granted unanimous approval for an extensive infrastructure and traffic improvement project for the intersection of Upland Road and Clapboardtree Street. The proposed project, estimated at $750,000, sought to address long-standing traffic congestion and safety concerns in the area. The plan included the construction of a three-phase intersection with dedicated left-turn storage lanes for both directions, as well as the addition of pedestrian sidewalks. A major component of the project involved raising the local railroad bridge from 12 to 14.5 feet and removing center posts to accommodate larger vehicle passage. Additionally, the grade of Upland Road was to be lowered by three feet to facilitate a safer transition into Clapboardtree Street. The proposal was forwarded to state consulting engineers for consideration under the Chapter 90 funding framework, marking a significant step toward regional infrastructure modernization.

Beyond the roadwork, the selectmen addressed a series of pressing municipal issues, most notably a regulatory crisis concerning the town dump. Having been notified by the state Department of Public Health (DPH) that the dump failed to meet new sanitary regulations—which mandated specific facilities, a communication system, and a detailed site plan—the board declared an emergency. This declaration allowed the town to extend its current dump contract by 90 days, providing the necessary window for Town Manager Walter A. Blasenak to negotiate a compliance plan with state officials. Blasenak emphasized that the town must demonstrate an “intent to comply” to avoid further penalties or the imposition of state-run management.

Financial management also featured prominently during the session, as the selectmen and the Norwood Board of Assessors debated a proposal to utilize $300,000 in Municipal Light Department receipts to offset the tax rate. Town Manager Blasenak projected that using these funds, combined with other year-end receipts, could potentially lower the tax rate from the 1970 figure of $102 per thousand. Despite some initial hesitation regarding the use of utility revenues for general tax relief, the board passed the motion unanimously, with Selectman Joseph Wall describing it as “the best of all evils” given the fiscal pressures facing the town. The meeting concluded with the board addressing various secondary matters, including noise and traffic complaints concerning Choppers Unlimited, a motorcycle repair firm on Morse Hill, and the scheduling of Little League Tag Days.

Archival Note: This article has been dynamically reconstructed from the original public record print archives of the Patriot Ledger

More…

  • State Approves Traffic Barrier to Block East Cross Street Access from Route 1-August 12, 1988

    Following a resident petition led by Joseph Burke and Rep. Gregory Sullivan after a child’s injury, the state approved a barrier blocking Route 1 access to East Cross Street.

  • Norwood Committee Faults T Study-July 9, 1987

    Discover the 1987 conflict between the Norwood Parking Committee and the MBTA regarding station parking statistics and the pushback against multi-level parking deck plans at the Norwood Depot.

    Comic illustration showing Boston MBTA green and orange trains at Government Center and North Station with crowds
  • SOfficials Tour Ellis Pond Dam and Meadow Brook Sites-August 22, 1984

    State Waterways Director John J. Hannon joined Norwood officials to inspect Ellis Pond Dam and the Meadow Brook watershed, targeting $850,000 in state funds toward critical flood mitigation.

  • Adams-Russell Cable Services Tells Norwood Selectmen Local Cable System is Completed-August 8, 1984

    Company Announces Energizing of Public Institutional Loop as Two-Year Rate Freeze Certification Process Approaches NORWOOD — Representatives from Adams-Russell Cable Services informed town selectmen last night that Norwood’s cable television system is officially complete. The declaration marks a critical milestone for both the Waltham-based company and local subscribers, as certification triggers the start of a…

  • Closed for Years, Repaved Section of Bond Street Set to Reopen-September 21, 1983

    Norwood selectmen order the reopening of a closed, repaved section of Bond Street and review upcoming town meeting warrant proposals for Route 1 reconstruction.

  • Ground Broken for University Avenue Industrial Road Extension-August 30, 1982

    State and local officials break ground on a $1 million University Avenue extension project designed to unlock prime industrial development in Norwood.

  • $1.5 Million Uptown Washington Street Reconstruction and Traffic Improvement Project Scheduled to Begin by Spring 1982-September 10, 1981

    State and local officials outline a $1.5 million Washington Street reconstruction project at a public hearing, targeting spring 1982 construction for traffic and street improvements.

  • South Norwood Committee Seeks Private Funding to Clean Landmark Railroad Bridges-June 26, 1981

    Faced with tight Proposition 2½ limits, South Norwood look to private donors to clean soot and graffiti off historic stone railroad spans.

  • Guild School Recreation Center Project & Eliot Field Renovation-August 26, 1980

    The Norwood Permanent Building Committee selected six architectural firms to interview for the Guild School renovation project, while Norwood Engineering secured the Eliot Field design contract.

  • Armory Still Eyed for Municipal Use-July 9, 1980

    Discover the 1980 efforts by town leadership to acquire the Norwood Armory from the state, following legislative changes and the recent Civic Center location shift.


Discover more from Norwood Historical Society

Subscribe to get the latest posts sent to your email.

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.