Unanimous 5-0 Vote Advances Scaled-Down Option 1 Ahead of Dec. 3 Special Town Meeting While Deferring Multi-Level Elevators
NORWOOD – The Norwood School Committee voted unanimously (5-0) on Saturday morning, November 17, 1979, to request approximately $20,000 at the December 3 Special Town Meeting to fund an initial phase of handicapped accessibility improvements at Norwood High School. Reported in The Patriot Ledger on Monday, November 19, 1979, the vote followed a joint morning session with the Permanent Building Construction Committee aimed at bringing the high school into baseline compliance with federal accessibility mandates.
School Committee Chairman Rudith Berkowitz described the funding request as the “initial step” and “the beginning of improvements for the handicapped at the high school.” During the joint review, officials evaluated three scaled-down alternatives pared back from an earlier $700,000 Permanent Building Construction Committee blueprint for comprehensive building-wide accessibility:
- Option 1 (~$20,000 – Selected): The least costly immediate option, providing an exterior access ramp on the east side of the auditorium, an entrance ramp to the boys’ gymnasium, and accessible restroom facilities near the gym.
- Option 2 ($210,000): Included all Option 1 ramps and restroom modifications plus the installation of a five-level interior elevator.
- Option 3 ($329,000): Expanded Option 2 by adding a second elevator near the adjoining Henry O. Peabody School.
Acknowledging the modest scope of the $20,000 package, Berkowitz noted: “At least option 1 gets people in wheelchairs and other handicapped in and out of the building. It’s a beginning – or minimal compliance – with the mandate of the federal government.” Looking ahead, Berkowitz indicated that the board’s next step would likely be a comprehensive modernization package presented to the Spring Annual Town Meeting, combining broader accessibility upgrades with renovations to the high school library, cafeteria, and potentially an elevator—noting that bundling renovations under one unified master plan would prove more economical and could qualify Norwood for substantial state school-building aid.
1979 Norwood High School Accessibility Options Adjusted to 2026 Dollars
Inflation-adjusted using U.S. Bureau of Labor Statistics CPI data ($1.00 in Nov. 1979 ≈ $4.33 in 2026)
| 1979 Norwood High Accessibility Plan | 1979 Cost | 2026 Equivalent |
|---|---|---|
| Option 1 (Ramps & Gym Restrooms – Selected) | ~$20,000 | ~$86,600 |
| Option 2 (Option 1 + Five-Level Elevator) | $210,000 | ~$909,300 |
| Option 3 (Option 2 + Second Elevator at Peabody Wing) | $329,000 | ~$1,424,570 |
| Original Comprehensive Total Accessibility Blueprint | $700,000 | ~$3,031,000 |
Archival Note: This article has been dynamically reconstructed from the original public record print archives of the Patriot Ledger
-
Public Schools Announce 1977-78 Opening Schedules and Projected Enrollment of 5,842 Students-August 31, 1977

Superintendent of Schools Philip O. Coakley has officially announced that all Norwood public schools-covering grades 1 through 12, alongside special education classes-will open for the 1977–78 academic year on Wednesday, September 7. Registration is open daily in each school building from 9:00 a.m. to 3:00 p.m. ahead of opening day, with classrooms prepped for an…
-
Norwood Zeroes In On School Vandals-August 3, 1977

A newly formed blue‑ribbon security committee convened to confront a surge of costly vandalism at Norwood’s public schools. Members reviewed structural, technological, and community‑based deterrents while assigning formal research duties for a comprehensive townwide response.
-
Special Needs Association Hosts Mock Core Evaluation at Oldham School Library-November 15, 1976

The Special Needs Association held a mock core evaluation at Oldham School Library led by Roderick Smith and William Deveney to guide parents through special education assessments.
-
Public Schools Enrollment Down 341 Students, Though Upcoming Apartment Construction Expected to Boost Numbers-September 16, 1976

Norwood school officials report a drop of 341 students in total enrollment, but anticipate new apartment construction will push numbers back up.
-
Louis Buscone Jr. Appointed High School Vice-Principal After Close School Committee Vote-September 9, 1976

Louis Buscone Jr. wins a one-year appointment as Norwood High School vice-principal by a 4-3 school committee vote as the board reviews declining enrollment figures.
-
Norwood School Committee Seeks Field Trip Funds and Awards Bus Transportation Contracts-July 29, 1976

Facing budget cuts that eliminated student field trips, the Norwood School Committee voted to appeal to the Finance Commission and special town meeting for restoration funds.
-
Norwood Board Rejects Blue Hills Collaborative-July 29, 1976

The summer of 1976 was a time of great change and uncertainty for the town of Norwood, Massachusetts. As the nation celebrated its bicentennial, local residents were grappling with issues of education, finance, and community involvement. One such issue that dominated the headlines in July 1976 was the proposed Blue Hills Collaborative, a vocational school…
-
Balch School Welcomes First Full-Time Bilingual Teacher for Growing Portuguese Student Community-October 24, 1975

Driven by parent advocacy led by Manuel DaCosta, the Balch School welcomed its first full-time bilingual teacher, Mrs. Diane Lawrence Callahan, to support Norwood’s growing Portuguese student population.
-
Balch School Library to Be Officially Dedicated as Grace M. Beverly Memorial Library-October 23, 1975

The Balch School library in South Norwood will be dedicated as the Grace M. Beverly Memorial Library, honoring the beloved former principal’s lifelong dedication to children’s literature and education.
Discover more from Norwood Historical Society
Subscribe to get the latest posts sent to your email.

