Unanimous 5-0 Vote Advances Scaled-Down Option 1 Ahead of Dec. 3 Special Town Meeting While Deferring Multi-Level Elevators
NORWOOD – The Norwood School Committee voted unanimously (5-0) on Saturday morning, November 17, 1979, to request approximately $20,000 at the December 3 Special Town Meeting to fund an initial phase of handicapped accessibility improvements at Norwood High School. Reported in The Patriot Ledger on Monday, November 19, 1979, the vote followed a joint morning session with the Permanent Building Construction Committee aimed at bringing the high school into baseline compliance with federal accessibility mandates.
School Committee Chairman Rudith Berkowitz described the funding request as the “initial step” and “the beginning of improvements for the handicapped at the high school.” During the joint review, officials evaluated three scaled-down alternatives pared back from an earlier $700,000 Permanent Building Construction Committee blueprint for comprehensive building-wide accessibility:
- Option 1 (~$20,000 – Selected): The least costly immediate option, providing an exterior access ramp on the east side of the auditorium, an entrance ramp to the boys’ gymnasium, and accessible restroom facilities near the gym.
- Option 2 ($210,000): Included all Option 1 ramps and restroom modifications plus the installation of a five-level interior elevator.
- Option 3 ($329,000): Expanded Option 2 by adding a second elevator near the adjoining Henry O. Peabody School.
Acknowledging the modest scope of the $20,000 package, Berkowitz noted: “At least option 1 gets people in wheelchairs and other handicapped in and out of the building. It’s a beginning – or minimal compliance – with the mandate of the federal government.” Looking ahead, Berkowitz indicated that the board’s next step would likely be a comprehensive modernization package presented to the Spring Annual Town Meeting, combining broader accessibility upgrades with renovations to the high school library, cafeteria, and potentially an elevator—noting that bundling renovations under one unified master plan would prove more economical and could qualify Norwood for substantial state school-building aid.
1979 Norwood High School Accessibility Options Adjusted to 2026 Dollars
Inflation-adjusted using U.S. Bureau of Labor Statistics CPI data ($1.00 in Nov. 1979 ≈ $4.33 in 2026)
| 1979 Norwood High Accessibility Plan | 1979 Cost | 2026 Equivalent |
|---|---|---|
| Option 1 (Ramps & Gym Restrooms – Selected) | ~$20,000 | ~$86,600 |
| Option 2 (Option 1 + Five-Level Elevator) | $210,000 | ~$909,300 |
| Option 3 (Option 2 + Second Elevator at Peabody Wing) | $329,000 | ~$1,424,570 |
| Original Comprehensive Total Accessibility Blueprint | $700,000 | ~$3,031,000 |
Archival Note: This article has been dynamically reconstructed from the original public record print archives of the Patriot Ledger
-
School Committee Inspects “Deplorable” Balch School, Demanding Immediate Repairs-October 27, 1966

Following a 90-minute inspection revealing rotting windows, cracked ceilings, and decaying staircases, the School Committee ordered immediate priority repairs for the 50-year-old Balch Elementary School.
-
Norwood Teachers Association Submits $1,000 Pay Increase Proposal-August 18, 1966

The Norwood Teachers Association submitted a $1,000-plus pay raise proposal as the school committee signed its first collective bargaining agreement amid debate led by John J. Cavanaugh and William Egan.
-
Andrew J. Ciarletta Jr. Appointed Principal of Winslow Elementary School-July 27, 1966

The Norwood School Committee appointed Andrew J. Ciarletta Jr. as principal of Winslow Elementary School, succeeding Alan R. Wonson.
-
“Middle School” Configuration Proposed to Address School Overcrowding-November 4, 1965

Norwood School Committee member William Egan proposed establishing a sixth-grade “middle school” and a 2,000-pupil high school to address surging enrollment pressures.
-
Retired Norwood Junior High Vice-Principal Mildred I. O’Donnell Honored at Testimonial Dinner-October 30, 1965

Celebrating a 47-year teaching career, retired Norwood Junior High vice-principal and dean of girls Mildred I. O’Donnell was honored during a testimonial dinner at the King Philip in Wrentham.
-
Superintendent Coakley Tells PTA Council That $4 Million in New School Construction Is Mandatory-September 10, 1965

Dr. Philip O. Coakley tells the PTA Council that $4 million in new school construction—including a new elementary and junior high—is mandatory to handle over-capacity enrollment.
-
Norwood School Committee Reviews Summer School Program and Proposes Token Fees-September 3, 1965

Following the successful completion of Norwood’s first town-sponsored summer school program—which enrolled approximately 330 local students in remedial coursework—the Norwood School Committee is evaluating future administrative structures, including a proposal to institute a nominal student fee. Superintendent Philip O. Coakley presented a comprehensive report detailing the inaugural summer session, noting that progress reports for every…
-
School Wiring Hazard Suspected at Norwood Junior High-September 3, 1965

Expressing deep concern over aging infrastructure, the Norwood School Committee has called for an immediate investigation into potential electrical wiring hazards at the Norwood Junior High School to determine whether emergency repairs are urgently required. The inquiry was initiated after Superintendent of Schools Philip O. Coakley delivered an alarming report on the condition of the…
-
Norwood Tennis Courts Recreation-July 10, 1965

On July 10, 1965, Norwood officials were actively working to resolve the placement of a proposed six-court tennis facility at the Prescott School. Recreation Superintendent Richard Ready noted that while the specific site remained undecided, he and other town officials were in the process of analyzing a location proposed by the Norwood School Committee. ⠀…
-
Balch School $300,000 Addition Outlines Three Formal State Approval Steps-November 7, 1964

Building Committee Chairman Alec Abdallah detailed the three formal state and municipal steps required to advance the $300,000 Balch School addition, which will add three classrooms, an auditorium, and a cafeteria.
Discover more from Norwood Historical Society
Subscribe to get the latest posts sent to your email.
