Dismantled Inside the 170-Foot Gothic Tower Since 1977, Walter F. Tilton’s 1928 British-Cast Gift Awaits $10,000 Framework Restoration and Roof Repairs
NORWOOD – High inside the 170-foot Gothic tower of Norwood Town Hall, the town’s treasured 50-bell carillon—a generous civic gift presented half a century earlier—sat dismantled and silent as the 1980 holiday season approached. Reported in The Patriot Ledger on Thursday, November 27, 1980, alongside a photograph peering inside the weather-worn bell chamber, the approaching holidays marked the third consecutive Christmas season without the familiar chimes ringing across downtown Norwood. Like municipal jobs and essential town services across Massachusetts, the future of the silenced bells now hinged directly on the fiscal constraints of Proposition 2½. (Note: In the raw OCR text, “Proposition 2½” was scanned as “Proposition 212.”)
For five decades, seasonal carillon concerts had been a signature Norwood tradition. During each recital, a carillonneur climbed the wooden tower steps, took a seat at an organ-like console, and pressed wooden baton handles and foot pedals to play the massive bronze bells overhead. In recent years, the town had funded roughly 15 concerts annually—most frequently during the Christmas season—until 1977, when inspections revealed that the metal support framework holding the bells was badly corroding from years of wind and rain exposure.
With three years of silence already elapsed, local leaders worried that newer residents scarcely realized the historic instrument existed above Washington Street. “The long-time residents respect and love the bells, but I doubt if townspeople in general know they are there,” remarked Selectman Chairman William J. Plasko.
Originally gifted to Norwood in 1928 by Walter F. Tilton, then president of the Norwood Trust Company, to coincide with the completion of the neo-Gothic Town Hall, the British-cast carillon was valued at $50,000 at the time of its installation. Supporting the 21-ton instrument required a heavy structural frame of metal beams; because the upper tower chamber was tight, the bells had to be dismantled and removed before the corroded supports could be rebuilt.
Town officials held a $10,000 repair estimate for the carillon framework, originally folded into a broader $350,000, three-year Town Hall renovation plan covering the roof, exterior masonry walls, and bell tower. At the June 1980 Town Meeting, voters balked at appropriating $145,000 for the first year of structural renovations, though they approved the $10,000 specifically to restore the carillon. Because the tower roof continued to leak, however, officials deemed it impractical to reinstall the refurbished bells before sealing the building envelope.
Longtime town watchdog Assessor George T. Mahoney—a former Finance Commission member renowned for closely guarding taxpayer dollars—argued passionately that the carillon deserved immediate restoration even if broader roof and tower work had to wait. “The bells are a work of art and did not cost the town anything,” Mahoney said. “They definitely should be refurbished and played again.” Plasko, though considerably younger than Mahoney, shared that sentiment, noting that selectmen had intended to return to the 1981 Town Meeting for tower repair funds—while acknowledging that Proposition 2½ cast new uncertainty over capital spending. Built in 1928 for $500,000 using Indiana limestone, Massachusetts granite, and Maine slate, the cathedral-like landmark now required roughly two-thirds of its original construction cost just to be restored to sound condition.
Source: The Patriot Ledger • Thursday, November 27, 1980
“The bells are a work of art and did not cost the town anything. They definitely should be refurbished and played again.”
| Norwood Town Hall & Carillon Benchmark | Historical Figure | Est. 2026 Value |
|---|---|---|
| 1928 Walter F. Tilton Carillon Gift Value | $50,000 (1928) | $937,500 |
| 1928 Neo-Gothic Town Hall Construction Cost | $500,000 (1928) | $9,375,000 |
| 1980 Carillon Framework Repair Appropriation | $10,000 (1980) | $39,500 |
| 1980 Three-Year Town Hall Renovation Estimate | $350,000 (1980) | $1,382,500 |
*Equivalent purchasing power based on U.S. Bureau of Labor Statistics CPI data.
Archival Note: This article has been dynamically reconstructed from the original public record print archives of the Patriot Ledger
-
Norwood Launches Training Program to Prepare New Generation of Carillonneurs for Town Hall’s Historic Bells-October 27, 1972

Spearheaded by Walter J. Dempsey and A. Franklin Swift Jr., Norwood has selected 17 high school students to train as carillonneurs for the town hall’s historic 1928 bell tower.
-
Seventeen High School Students Selected to Train on Norwood Municipal Building Carillon-October 24, 1972

Reviving a 1928 Musical Tradition Since its installation in 1928, Norwood’s unique carillon housed within the municipal building tower has been mastered and regularly played by only two musicians. However, a sweeping new initiative launched by town officials and school leaders is set to expand the town’s supply of carillonneurs by 17. The revival was…
-
Dean Emeritus Returns to Play Carillon Bells-August 26, 1964

Dr. Kamiel LeFevere returns to play Norwood’s municipal carillon, commemorating the bells installed in 1928 through the generosity of philanthropist Walter Tilton.
-
Roger Walker, Norwood’s Blind Carillonneur-June 3, 1954

Roger “Zeke” Walker, Blind Carillonneur, Performs 19 Concerts a Year from the Locked Tower of Norwood Town Hall High above the bustle of Norwood Center, behind a locked door leading to the tower of the Norwood Town Hall, one of the most remarkable musicians in America performs nearly twenty concerts a year. He is Roger…
-
Norwood’s Bell Ringer-This Day In Norwood History-August 20, 1938

This Day In Norwood History-August 20, 1938-Norwood’s Bell Ringer
-
Norwood Will Dedicate Memorial Building Tomorrow-November 10, 1928

Norwood Will Dedicate Memorial Building Tomorrow-This Day In Norwood History-November 10, 1928
-
Norwood to Install Second Largest Carillon in the US-August 29, 1928

The town of Norwood is poised to house the second largest carillon in the United States with the arrival and installation of a magnificent set of bells in the tower of the Norwood Memorial Municipal Building. With exterior scaffolding recently removed, heavy rigging equipment and a derrick have been erected to hoist the massive bells…
Discover more from Norwood Historical Society
Subscribe to get the latest posts sent to your email.



