Dismantled Inside the 170-Foot Gothic Tower Since 1977, Walter F. Tilton’s 1928 British-Cast Gift Awaits $10,000 Framework Restoration and Roof Repairs
NORWOOD – High inside the 170-foot Gothic tower of Norwood Town Hall, the town’s treasured 50-bell carillon—a generous civic gift presented half a century earlier—sat dismantled and silent as the 1980 holiday season approached. Reported in The Patriot Ledger on Thursday, November 27, 1980, alongside a photograph peering inside the weather-worn bell chamber, the approaching holidays marked the third consecutive Christmas season without the familiar chimes ringing across downtown Norwood. Like municipal jobs and essential town services across Massachusetts, the future of the silenced bells now hinged directly on the fiscal constraints of Proposition 2½. (Note: In the raw OCR text, “Proposition 2½” was scanned as “Proposition 212.”)
For five decades, seasonal carillon concerts had been a signature Norwood tradition. During each recital, a carillonneur climbed the wooden tower steps, took a seat at an organ-like console, and pressed wooden baton handles and foot pedals to play the massive bronze bells overhead. In recent years, the town had funded roughly 15 concerts annually—most frequently during the Christmas season—until 1977, when inspections revealed that the metal support framework holding the bells was badly corroding from years of wind and rain exposure.
With three years of silence already elapsed, local leaders worried that newer residents scarcely realized the historic instrument existed above Washington Street. “The long-time residents respect and love the bells, but I doubt if townspeople in general know they are there,” remarked Selectman Chairman William J. Plasko.
Originally gifted to Norwood in 1928 by Walter F. Tilton, then president of the Norwood Trust Company, to coincide with the completion of the neo-Gothic Town Hall, the British-cast carillon was valued at $50,000 at the time of its installation. Supporting the 21-ton instrument required a heavy structural frame of metal beams; because the upper tower chamber was tight, the bells had to be dismantled and removed before the corroded supports could be rebuilt.
Town officials held a $10,000 repair estimate for the carillon framework, originally folded into a broader $350,000, three-year Town Hall renovation plan covering the roof, exterior masonry walls, and bell tower. At the June 1980 Town Meeting, voters balked at appropriating $145,000 for the first year of structural renovations, though they approved the $10,000 specifically to restore the carillon. Because the tower roof continued to leak, however, officials deemed it impractical to reinstall the refurbished bells before sealing the building envelope.
Longtime town watchdog Assessor George T. Mahoney—a former Finance Commission member renowned for closely guarding taxpayer dollars—argued passionately that the carillon deserved immediate restoration even if broader roof and tower work had to wait. “The bells are a work of art and did not cost the town anything,” Mahoney said. “They definitely should be refurbished and played again.” Plasko, though considerably younger than Mahoney, shared that sentiment, noting that selectmen had intended to return to the 1981 Town Meeting for tower repair funds—while acknowledging that Proposition 2½ cast new uncertainty over capital spending. Built in 1928 for $500,000 using Indiana limestone, Massachusetts granite, and Maine slate, the cathedral-like landmark now required roughly two-thirds of its original construction cost just to be restored to sound condition.
Source: The Patriot Ledger • Thursday, November 27, 1980
“The bells are a work of art and did not cost the town anything. They definitely should be refurbished and played again.”
| Norwood Town Hall & Carillon Benchmark | Historical Figure | Est. 2026 Value |
|---|---|---|
| 1928 Walter F. Tilton Carillon Gift Value | $50,000 (1928) | $937,500 |
| 1928 Neo-Gothic Town Hall Construction Cost | $500,000 (1928) | $9,375,000 |
| 1980 Carillon Framework Repair Appropriation | $10,000 (1980) | $39,500 |
| 1980 Three-Year Town Hall Renovation Estimate | $350,000 (1980) | $1,382,500 |
*Equivalent purchasing power based on U.S. Bureau of Labor Statistics CPI data.
Archival Note: This article has been dynamically reconstructed from the original public record print archives of the Patriot Ledger
-
Did You Know? The Cost of the Tilton Carillon Bells

For more information about Walter Tilton, who donated the carillon bells, click here. Click here to browse our entire ‘Did You Know” Series Discover more from Norwood Historical Society Subscribe to get the latest posts sent to your email. Type your email… Subscribe
-
World-Class Musicians Command the Town’s Historic Carillon-July 21, 2014

The town of Norwood was treated to a unique musical experience on July 21, 2014, as international carillonneurs Elena Sadina and Sergei Gratchev performed at the Tilton Memorial Carillon on Norwood Town Hall.
-
Preservation Completed at Norwood Memorial Municipal Building-This Day in Norwood History-January 26, 2014

Norwood, MA—The late-gothic Norwood Memorial Municipal Building was built in 1927-28, and consists of a four-story solid masonry structure with split-face granite block veneer and limestone bandings. The existing roof consists of slate shingles and sheet metal copper flashings. The 120′ carillon tower consists of split face granite block veneer, limestone bandings, limestone and mahogany…
-
Norwood’s 3 Concert Series Please All-June 25, 2005

The lineup spans large-ensemble Sunday shows, Wednesday night Summerfest events, and historic 53-bell carillon performances from the Memorial Tower.
-
Town Hall Carillon Rings Out Again After Five-Year Silence in Historic Concert by Martin Gilman-November 14, 1983

Following a $40,000 municipal refurbishment, carillonneur Martin Gilman performed a 1.5-hour concert on Norwood Town Hall’s 50-bell carillon following Veterans Day ceremonies.
-
Tilton Carillon Undergoes Final Tuning by British Bell Specialists and Carilloneur Martin A. Gilman-October 24, 1983

British bell founders from John Taylor & Co. and carilloneur Martin A. Gilman complete final tuning on Norwood Town Hall’s historic 50-bell carillon ahead of the uptown revitalization dedication.
-
English Artisans Begin Restoring Norwood Town Hall’s 50-Bell Carillon After Five-Year Silence-October 7, 1983

Two English artisans from John Taylor & Co. begin a $29,000 project to restore Norwood Town Hall’s 50-bell carillon after a five-year silence.
-
Town hall repairs on the way-June 22, 1981

Water leaks and weathering threaten a local landmark, prompting municipal leaders to search for an expert restoration architect.
-
Town Hall’s 50-Bell Carillon Faces Third Silent Christmas As Repairs Hinge On Proposition 2½-November 27, 1980

Dismantled inside Norwood Town Hall’s 170-foot Gothic tower since 1977 due to framework corrosion, Walter F. Tilton’s 1928 50-bell carillon faced its third silent Christmas in November 1980 as Selectman Chairman William J. Plasko and Assessor George T. Mahoney weighed repairs under Proposition 2½.
-
Old Norwood Carillon Retains Clarity-November 23, 1972

Bells rang Sunday afternoon in Norwood town square. The occasion was the dedication of a marker commemorating the town’s 100th anniversary, and the star performer was the 44-year-old carillon encased in the bell tower of Town Hall. The simple, pure sound of the 52-bell instrument was orchestrated by guest carillonneur Earl Chamberlain of Cohasset and…
Discover more from Norwood Historical Society
Subscribe to get the latest posts sent to your email.

