An Ambitious Vision for Norwood’s

On July 21, 1978, the town of Norwood found itself contemplating a transformative infrastructure proposal that promised to fundamentally alter the local landscape. According to a report in The Patriot Ledger, the local Department of Public Works (DPW) unveiled a comprehensive, massive road resurfacing project estimated to cost $1.9 million. This sweeping initiative sought to address the long-standing issue of deteriorating street conditions, with the proposed scope detailed across 14 pages of a technical report containing over 300 individual line items.
The project was championed by Selectman Walter J. Dempsey, who argued that the town’s traditional approach to maintenance had proven inadequate. Walter J. Dempsey contended that for the previous 40 years, road upkeep had been systematically neglected. He specifically criticized the annual road maintenance budget of $150,000, characterizing it as a “drop in the bucket” and stating, “You’re not even keeping pace.” Walter J. Dempsey firmly believed that a complete resurfacing of the town’s network was both a practical necessity and a politically viable objective, even amidst the era’s prevailing public sentiment against increased government spending.
To mitigate the financial burden on residents, Walter J. Dempsey proposed a strategic five-year plan funded through a bond issue, which would distribute the $1.9 million cost over an extended timeframe. He also suggested that streets already recently improved and currently in good condition would be excluded from the scope of work. By ensuring that every motorist could depart their home onto smooth, high-quality pavement, Walter J. Dempsey hoped to foster town-wide unity and eliminate the “small sectional jealousies” that often arose from prioritized or uneven local maintenance schedules.
The plan faced significant practical and fiscal scrutiny. DPW Supt. Nicholas G. Joseph provided a more immediate outlook, listing 19 specific streets slated for standard resurfacing in 1979 at a projected cost of $169,975. Howard, a finance commissioner, voiced skepticism regarding the feasibility of such a wide-scale project within a single year, flatly stating, “No way you do that in one year.” He further questioned whether the standard annual budget was simply too lean to address the systemic needs of the town’s roadways. Walter J. Dempsey acknowledged that the support of the Finance Commission (FinCom) was essential for the plan’s success, noting that without such institutional backing, the proposal was “hopeless.”
Archival Note: This article has been dynamically reconstructed from the original public record print archives of the Patriot Ledger
More…
-
Norwood Tests New Traffic Pattern at Subway Hill Intersection in South Norwood-October 29, 1980

Following recommendations from the South Norwood study committee, selectmen approved a temporary traffic island experiment at Subway Hill to improve safety at Washington and Chapel streets.
-
Guild School Recreation Center Project & Eliot Field Renovation-August 26, 1980

The Norwood Permanent Building Committee selected six architectural firms to interview for the Guild School renovation project, while Norwood Engineering secured the Eliot Field design contract.
-
Guild School Picked for Civic Center-July 8, 1980

Discover the 1980 decision that transformed the Aaron Guild School into a multi-purpose recreation hub, replacing the former Civic Center sold to Norwood Hospital.
-
Only Two Norwood Intersections Qualify for Right Turns on Red Under New State Law-October 3, 1979

Following a town survey, Town Manager John J. Carroll announces that right-on-red turns will be permitted at only two Norwood intersections when the state law takes effect.
-
Norwood Selectmen Consider One-Way Traffic, Business District Upgrades-August 8, 1979

Building on the Washington Street revitalization project, Town Manager John J. Carroll proposed working with local merchants to secure a second Urban Systems grant for Nahatan Street improvements.
-
Road Resurfacing Project in Norwood-This Day In Norwood History-July 21, 1978

Faced with decades of neglected road maintenance, Norwood officials debated an ambitious $1.9 million resurfacing plan in 1978. While proponents saw it as a path to smooth roads, others questioned the feasibility of the massive effort.
-
Businessman John P. Alevizos Willing to Pay for Walpole Street Traffic Lights-November 7, 1977

Tired of waiting for state action, shopping center developer John P. Alevizos has agreed to privately finance $60,000 in traffic signalization and road improvements at Walpole and Wilson Streets.
-
Uncertainty Looms Over Norwood Junior High South Opening Date-July 12, 1974

After three years of double sessions following a 1971 fire, Norwood officials faced the possibility of further delays for the new Junior High South.
Discover more from Norwood Historical Society
Subscribe to get the latest posts sent to your email.


