Board Lowers School Thermostats to 65 Degrees and Evaluates $7,000 to $329,000 High School Handicapped Accessibility Plans
NORWOOD – In a contentious session on Wednesday night, November 14, 1979, an effort to place the controversial Willett School closing plan back onto the Norwood School Committee agenda for further review ended in a 3-3 deadlock. Initiated by committee member Joseph M. Pentowski, who sought to schedule the matter for the December 14 agenda, the motion sparked a lengthy debate over how closing the Willett School would impact enrollment across other district buildings. Pentowski, Charles Saraca, and Richard Joseph repeatedly pressed Superintendent Louis J. Taris regarding warnings from teachers and administrators that the Cleveland School and special services programs could become severely overcrowded.
Pentowski, Saraca, and William F. Egan voted in favor of reopening the discussion, while Chairman Rudith M. Berkowitz, Joan Cuff, and Joseph voted against—with William Pudsey abstaining. Although Joseph honored his April election campaign promise not to move for reconsideration of the board’s January vote to close the Willett, he acknowledged, “I do have some problems with the plan.” Amid sharp exchanges of “politicking” between Berkowitz and Pentowski, Berkowitz insisted, “You are only trying to forestall action on a decision that has already been made,” before Superintendent Taris closed the debate calmly: “All I am going to say is, I know how to handle these things.”
Energy Conservation Directives and High School Accessibility Options
Ironically, inside an uncomfortably warm school committee meeting room, members voted unanimously to enact immediate energy-saving mandates aligned with U.S. Department of Energy guidelines. The directive ordered all thermostats in secondary schools and the administration building lowered to 65 degrees during occupied daytime hours and 55 degrees at night, while lowering hot water temperatures across all school buildings to 105 degrees or the lowest functional setting. Superintendent Taris also noted ongoing initiatives to insulate the Norwood High School ceiling, recalibrate classroom univents, and conduct a district-wide electrical audit.
Meanwhile, the Permanent Building Committee, chaired by Roger Pelletier, delivered cost estimates to the School Committee for three scaled-down plans designed to improve handicapped accessibility at Norwood High School under federal mandates, serving as lower-cost alternatives to a comprehensive $700,000 accessibility plan recommended in September:
- Option 1 ($7,000 to $19,000): Construction of accessibility ramps at the east side of the auditorium and the boys’ gymnasium entrance, plus accessible restroom facilities near the gym.
- Option 2 ($210,000): Includes all Option 1 improvements plus a five-level passenger elevator.
- Option 3 ($329,000): Includes all Option 1 and Option 2 upgrades plus a second elevator near the adjoining Henry O. Peabody School.
Assistant Superintendent for Secondary Education James R. Donovan explained that the scaled-down options were intended to “show good intent” toward federal compliance ahead of a potential future high school renovation, while Pelletier and architect Leonard Quann of Korslund, LeNormand and Quann prepared to review the blueprints with the school board.
Word Count Documentation
- Original Article Word Count: 566 words
- Rewritten Narrative Word Count: 578 words
1979 High School Accessibility Cost Options Adjusted to 2026 Dollars
Adjusted for inflation using U.S. Bureau of Labor Statistics CPI data ($1.00 in Nov. 1979 ≈ $4.33 in 2026)
| 1979 Accessibility Proposal | 1979 Estimate | 2026 Equivalent |
|---|---|---|
| Option 1: Auditorium & Gym Ramps + Accessible Restroom | $7,000 – $19,000 | ~$30,310 – $82,270 |
| Option 2: Option 1 + Five-Level Elevator | $210,000 | ~$909,300 |
| Option 3: Option 2 + Second Elevator near Henry O. Peabody School | $329,000 | ~$1,424,570 |
| Full Building Committee Plan: Total High School Accessibility | $700,000 | ~$3,031,000 |
Archival Note: This article has been dynamically reconstructed from the original public record print archives of the Patriot Ledger
-
Superintendent Sets Nov. 1 Deadline for School Closing Plans Amid Enrollment Decline-September 14, 1978

Superintendent Louis J. Taris sets a Nov. 1 deadline for school closure contingency plans as the Norwood School Committee weighs enrollment drops and facility consolidation.
-
Norwood School Committee Considers Staggered School Closing Plan-July 14, 1978

The school housing needs committee last night recommended a second school closing plan that would close the doors of the Callahan School in September, shut down the Balch School in 1981 and close a third, unnamed elementary school in 1983. The plan was backed by seven of the nine members voting and was billed as…
-
School Closing Key Concern of Taxpayers-July 7, 1978

Thirty-six Norwood taxpayers file a Norfolk Superior Court lawsuit to restore $618,795 cut from the school budget, challenging forced school closures and teacher layoffs.
-
Norwood School Closing Impossible Before 1979, Committee Declares-November 10, 1977

Facing declining enrollments and public pressure, Norwood school officials at Winslow School confirmed that any elementary school closure is impossible before September 1979, prioritizing education over civic recreation needs.
-
School Committee Split Over Closing the Shattuck and Winslow Buildings-June 19, 1974

Debate intensifies at a Norwood School Committee meeting over redistricting, school closures, and federal grants.
-
Shattuck PTA Petitions Norwood School Committee to Support Portable Gym Request-November 4, 1971

Backed by 160 parent signatures presented by Joseph M. Pentowski, the Norwood School Committee unanimously voted to add a portable gymnasium for Shattuck School to the 1972 budget.
-
Closing of the Everett School Causes Overcrowding Emergency-November 3, 1923

Closing of the Everett School Causes Overcrowding Emergency-This Day In Norwood History-November 3, 1923
Discover more from Norwood Historical Society
Subscribe to get the latest posts sent to your email.

