Following months of public hearings and negotiations, the Planning Board voted unanimously last night to recommend against constructing a connecting road between Route 1 and Route I-95 at town expense for the proposed Norwood Arena industrial park development.
“Park Place” Industrial Subdivision Plans
Planning Board Chairman Thomas F. Cavanaugh announced the decision after reviewing a status report from Boston engineering firm Metcalf and Eddy Inc., which was hired to study future industrial development on the 220 buildable acres of the Norwood Arena site. Metcalf and Eddy reported that during an August 19 meeting with the state Department of Public Works (DPW), state officials confirmed they would reject any subdivision design that altered the existing cloverleaf interchange at Neponset Street and Route I-95—ruling out two initial connecting road proposals that required cloverleaf modifications.
Consequently, the planning board voted to inform selectmen that the industrial park—named “Park Place” by developer James H. Shane (31-year-old board chairman of Appendagez Inc. and Faded Glory clothing distributors) after the popular board game—should proceed strictly as an internal industrial subdivision. Drawn by Richard Merriken of Norwood Engineering Co., the master plan encompasses just over one mile of roadway built to county standards for Chapter 90 stipulations, should a highway connection ever become viable in the future.
The planning board established a mandatory bank performance bond of $576,000 for the industrial park development. Merriken reported that the project had already secured approval from the Norwood Conservation Commission and anticipated no obstacles from the U.S. Army Corps of Engineers regarding building permits.
Archival Note: This article has been dynamically reconstructed from the original public record print archives of the Patriot Ledger
More…
-
$1.5 Million Uptown Washington Street Reconstruction and Traffic Improvement Project Scheduled to Begin by Spring 1982-September 10, 1981

State and local officials outline a $1.5 million Washington Street reconstruction project at a public hearing, targeting spring 1982 construction for traffic and street improvements.
-
Norwood Tests New Traffic Pattern at Subway Hill Intersection in South Norwood-October 29, 1980

Following recommendations from the South Norwood study committee, selectmen approved a temporary traffic island experiment at Subway Hill to improve safety at Washington and Chapel streets.
-
Guild School Recreation Center Project & Eliot Field Renovation-August 26, 1980

The Norwood Permanent Building Committee selected six architectural firms to interview for the Guild School renovation project, while Norwood Engineering secured the Eliot Field design contract.
-
Guild School Picked for Civic Center-July 8, 1980

Discover the 1980 decision that transformed the Aaron Guild School into a multi-purpose recreation hub, replacing the former Civic Center sold to Norwood Hospital.
-
Only Two Norwood Intersections Qualify for Right Turns on Red Under New State Law-October 3, 1979

Following a town survey, Town Manager John J. Carroll announces that right-on-red turns will be permitted at only two Norwood intersections when the state law takes effect.
-
Norwood Selectmen Consider One-Way Traffic, Business District Upgrades-August 8, 1979

Building on the Washington Street revitalization project, Town Manager John J. Carroll proposed working with local merchants to secure a second Urban Systems grant for Nahatan Street improvements.
-
Road Resurfacing Project in Norwood-This Day In Norwood History-July 21, 1978

Faced with decades of neglected road maintenance, Norwood officials debated an ambitious $1.9 million resurfacing plan in 1978. While proponents saw it as a path to smooth roads, others questioned the feasibility of the massive effort.
-
Businessman John P. Alevizos Willing to Pay for Walpole Street Traffic Lights-November 7, 1977

Tired of waiting for state action, shopping center developer John P. Alevizos has agreed to privately finance $60,000 in traffic signalization and road improvements at Walpole and Wilson Streets.
Discover more from Norwood Historical Society
Subscribe to get the latest posts sent to your email.


