Board Refuses Bond Releases on Fieldbrook Drive, Dell Road, and Croyden Road and Holds Off on Hampden Road Estimate Pending Utility Inspections
NORWOOD – Frustrated by 17 years of unfinished subdivision roadwork off Chapel Street, members of the Norwood Planning Board engaged in heated debate on Monday night, November 20, 1967, over calling the performance bonds on the long-stalled Albert P. Nelson residential subdivision—refusing to release existing bonds on Fieldbrook Drive, Dell Road, and Croyden Road while signaling they would reject any further requests for extensions. Reported in The Patriot Ledger on Tuesday, November 21, 1967, the dispute centered on lingering infrastructure defects that had prevented the neighborhood streets from meeting Norwood town engineering standards for nearly two decades.
According to Town Engineer Robert A. Hamilton, inspections revealed multiple construction discrepancies along Fieldbrook Drive and Dell Road—which had been built by contractor Frank Simoni—as well as Croyden Road, built by Philip Phillips. The prolonged standoff sparked bitter discussion among board members, who struggled to recall why the town had not called the developer’s surety bonds years earlier. When Hamilton observed that late November was the wrong season for road construction, Planning Board member Francis Wisgirda shot back, “It’s always the wrong time of year,” while member Thomas A. Riolo pointed out that Mr. Nelson “has had 17 summers to complete the roads.”
Calling performance bonds allows the municipality to seize developer-backed insurance funds to finish substandard streets itself, though board members noted that bond forfeitures frequently trigger litigation. Wisgirda formally recommended that the board prepare to call the bonds at its next meeting if Nelson requested additional time—and do so without waiting to notify him in advance. Chairman J. Edward Bamber declared that if the developer sought another extension, the board’s answer would be to finish the streets “before we get to court.”
In separate subdivision bond business the same evening, the Planning Board declined to set a performance bond amount for Hampden Road until installed utilities were cleaned and inspected by Town Engineer Hamilton. The bond estimate request had been submitted by Walpole attorney Bernard J. Martin on behalf of Benjamin Koehl, David Harris, and Robert Green, the current owners of the 23-lot subdivision originally owned by A. C. Riley of Canton, who had installed the initial street utilities. Hamilton advised the board he could not calculate a reliable bond figure until the underground utilities were thoroughly flushed and verified.
Archival Note: This article has been dynamically reconstructed from the original public record print archives of the Patriot Ledger
-
1923 Planning Board Report-Existing East-West Through Streets and Diagonals

When the main thoroughfares of Norwood were laid out a century or more ago for a convenient approach to fields and pastures and to connect knots of houses or villages with one another, less continuity was secured in the east-west routes than the north-south. As the north-south streets served to connect Boston with Providence and…
-
1923 Planning Board Report-Proposed Additional East-West Through Streets and Diagonals

In the wide interspaces between the existing east-west thoroughfares there are many local streets already built, and many more contemplated or actually under construction. Gradually, in a long term of years, all these wild lands will be traversed by roads as the population of the Town increases. These roads will be built by private initiative…
-
1923 Planning Board Report-Existing North-South Through Streets

The existing through streets of Norwood, as shown above, were laid out in times before the construction of the steam railroads, before the large industries were established, and, of course, long before the development of modern housing and the beginnings of motor vehicle transportation. These through streets belong to the epoch of the chaise, the…
-
1923 Planning Board Report-Proposed Additional North-South Through Streets and Diagonals

In the outlying districts of the Town where new houses and new streets are springing up, the individual land owners have used and are still using customary skill and foresight in the planning of individual lots to meet the desires of house builders and to make the lots accessible from the local streets of these…
-
1923 Planning Board Report-Development of Clark Swamp District

The built-up area of Norwood is gradually approaching the margins of the Clark Swamp district. Under good or bad planning this entire neighborhood is destined to be crossed by streets and built up with dwellings. The cost of this work will be borne inevitably by the citizens of the Town. If good planning is applied…
-
1923 Planning Board Report-Schools, Parks and Playgrounds

On the accompanying map are shown the public schools of Norwood. They are grouped most closely near the center of the Town with scattered buildings on the outskirts. Evidently school locations will follow the centers of new growth, but the extent to which these structures will be scattered depends upon the policies adopted in the…
-
1923 Planning Board Report-Vicinity of High Bridge

The complicated and dangerous arrangement of roadways, railway tracks for electric and steam cars, in combination with a narrow underpass in the High Bridge district illustrates forcibly the costly results of allowing important road junctions to “happen by chance.” It is true that these junctions were created at a time when traffic in this neighborhood…
-
1923 Planning Board Report-Plan For Parkway

Discover more from Norwood Historical Society Subscribe to get the latest posts sent to your email. Type your email… Subscribe
-
Planning Board Records Remain Largely Missing After Eighteen Months-July 18, 1991

Minutes from 1973 to 1983 remain missing, complicating the town’s ability to track official votes and planning decisions from that era.