The Norwood Building Code Board of Appeal issued a decisive ruling on the evening of July 10, 1975, unanimously rejecting a formal request by George Whitten to waive a mandatory firewall requirement at his commercial warehouse on Oceana Drive.

The sprawling building represents one of two major warehouse facilities owned by Whitten within the industrial University Avenue development zone. At the time of the hearing, the facility housed two distinct commercial tenants: United Liquors and the Olympic Adhesives Company.
⠀
Under the provisions of the town’s zoning parameters, the adhesives corporation is explicitly categorized as a manufacturing facility, whereas the liquor distribution company leases its designated sector purely for storage operations. Because the structure housed a “mixed occupancy,” Town Building Inspector John E. Grover ruled that the adjacent quarters of the two businesses must be physically separated by a formal three-hour rated firewall. A basic corrugated metal partition was the only structure dividing the two commercial spaces at the time. Whitten and his project engineer, William Merry, challenged Grover’s interpretation of the state building rules, asserting that neither firm would require a three-hour firewall if they operated as the sole occupant of the property, and therefore the requirement should not apply to the shared layout. They also presented data showing that Olympic Adhesives utilized water-based glues that were officially categorized as a low-hazard risk by their corporate insurance provider.
⠀
However, both Inspector Grover and the building board counter-argued that under current state structural laws, any active manufacturing enterprise is strictly required to feature a three-hour rated firewall boundary, regardless of whether its product output is technically classified as a low, moderate, or high hazard. Grover further revealed that although Olympic Adhesives had successfully secured a specialized manufacturing permit for a limited industrial zone from the zoning board, the firm had been blocked from receiving a final occupancy permit due to the unresolved firewall dispute. Board members John Reardon, Ernest Higgins, and Larry Harrold voted unanimously to deny the waiver. Because the state building code had recently been updated to legally supersede all municipal regulations, the board’s local decision was formatted to be sent directly to the state Building Code Commission for final administrative approval.
Archival Note: This article has been dynamically reconstructed from the original public record print archives of the Patriot Ledger
More…
-
Guild School Picked for Civic Center-July 8, 1980
Discover the 1980 decision that transformed the Aaron Guild School into a multi-purpose recreation hub, replacing the former Civic Center sold to Norwood Hospital.

-
Norwood Selectmen Consider One-Way Traffic, Business District Upgrades-August 8, 1979
Building on the Washington Street revitalization project, Town Manager John J. Carroll proposed working with local merchants to secure a second Urban Systems grant for Nahatan Street improvements.

-
Road Resurfacing Project in Norwood-This Day In Norwood History-July 21, 1978
Faced with decades of neglected road maintenance, Norwood officials debated an ambitious $1.9 million resurfacing plan in 1978. While proponents saw it as a path to smooth roads, others questioned the feasibility of the massive effort.

-
Uncertainty Looms Over Norwood Junior High South Opening Date-July 12, 1974
After three years of double sessions following a 1971 fire, Norwood officials faced the possibility of further delays for the new Junior High South.

-
Unfinished Junior High To Open On Schedule-July 8, 1974
Discover the construction history of the $4.5 million Junior High South project in 1974, detailing the challenges faced during the transition from the old Washington Street school.

-
Selectmen Authorize Water Main Connection and Space Transfers for Phased-Out Schools-June 26, 1974
Shaw Street Infrastructure Upgrades Approved While Winslow and Shattuck Buildings Repurposed for Town Services The Board of Selectmen enacted a series of municipal infrastructure and real estate management decisions during last night’s executive session. In a unanimous vote, selectmen approved a formal request to seek a $16,000 budget transfer from the Finance Commission to construct…

-
Alandale Parkway Residents Demand Answers on Long-Delayed Street Acceptance-September 13, 1972
Alandale Parkway residents demand answers from Norwood selectmen regarding a decade-long delay in street acceptance and severe sidewalk deterioration.

-
$1.8 Million in Major Traffic and Safety Improvements Recommended-September 1, 1972
Comprehensive Traffic and Safety Overhaul Recommended for Norwood in Final Federal TOPICS Report A comprehensive and exhaustive final engineering report, recently delivered to local town selectmen, has outlined a sweeping, multi-faceted proposal to dramatically overhaul Norwood’s municipal road network, upgrade intersection safety, and alleviate escalating vehicular congestion throughout the community. Prepared by the prominent Chestnut…

Discover more from Norwood Historical Society
Subscribe to get the latest posts sent to your email.