Unanimous 5-0 Vote Advances Scaled-Down Option 1 Ahead of Dec. 3 Special Town Meeting While Deferring Multi-Level Elevators
NORWOOD – The Norwood School Committee voted unanimously (5-0) on Saturday morning, November 17, 1979, to request approximately $20,000 at the December 3 Special Town Meeting to fund an initial phase of handicapped accessibility improvements at Norwood High School. Reported in The Patriot Ledger on Monday, November 19, 1979, the vote followed a joint morning session with the Permanent Building Construction Committee aimed at bringing the high school into baseline compliance with federal accessibility mandates.
School Committee Chairman Rudith Berkowitz described the funding request as the “initial step” and “the beginning of improvements for the handicapped at the high school.” During the joint review, officials evaluated three scaled-down alternatives pared back from an earlier $700,000 Permanent Building Construction Committee blueprint for comprehensive building-wide accessibility:
- Option 1 (~$20,000 – Selected): The least costly immediate option, providing an exterior access ramp on the east side of the auditorium, an entrance ramp to the boys’ gymnasium, and accessible restroom facilities near the gym.
- Option 2 ($210,000): Included all Option 1 ramps and restroom modifications plus the installation of a five-level interior elevator.
- Option 3 ($329,000): Expanded Option 2 by adding a second elevator near the adjoining Henry O. Peabody School.
Acknowledging the modest scope of the $20,000 package, Berkowitz noted: “At least option 1 gets people in wheelchairs and other handicapped in and out of the building. It’s a beginning – or minimal compliance – with the mandate of the federal government.” Looking ahead, Berkowitz indicated that the board’s next step would likely be a comprehensive modernization package presented to the Spring Annual Town Meeting, combining broader accessibility upgrades with renovations to the high school library, cafeteria, and potentially an elevator—noting that bundling renovations under one unified master plan would prove more economical and could qualify Norwood for substantial state school-building aid.
1979 Norwood High School Accessibility Options Adjusted to 2026 Dollars
Inflation-adjusted using U.S. Bureau of Labor Statistics CPI data ($1.00 in Nov. 1979 ≈ $4.33 in 2026)
| 1979 Norwood High Accessibility Plan | 1979 Cost | 2026 Equivalent |
|---|---|---|
| Option 1 (Ramps & Gym Restrooms – Selected) | ~$20,000 | ~$86,600 |
| Option 2 (Option 1 + Five-Level Elevator) | $210,000 | ~$909,300 |
| Option 3 (Option 2 + Second Elevator at Peabody Wing) | $329,000 | ~$1,424,570 |
| Original Comprehensive Total Accessibility Blueprint | $700,000 | ~$3,031,000 |
Archival Note: This article has been dynamically reconstructed from the original public record print archives of the Patriot Ledger
-
Norwood School Committee Narrows Superintendent Search to Three Finalists, Including Junior High North Principal James R. Savage-August 11, 1982

Junior High North Principal James R. Savage was named one of three finalists for Norwood superintendent of schools, alongside Arlington assistant superintendent William J. Birmingham and Rhode Island administrator Nora M. Walker.
-
Peabody School Graduates Told Of Obligation To Support Education-June 25, 1982

School officials emphasize community obligations and moral commitments to public education during exercises at Junior High School South.
-
Norwood High School 1962 Addition Cleared of Asbestos Hazards in State Safety Survey-November 3, 1981

Following state inspections of regional schools built between 1946 and 1972, Norwood High School has been cleared of asbestos hazards, with reinspection set for next year.
-
Junior High South Approves ‘Project Adventure’ Obstacle Course Gym Class-October 15, 1981

Junior High South introduces “Project Adventure,” an outdoor physical education obstacle course designed to build teamwork and move away from competitive sports.
-
Norwood High School Senior Edward J. Skricki Named Merit Scholarship Semi-Finalist; Three Peers Commended-October 13, 1981

Norwood High senior Edward J. Skricki achieves National Merit Scholarship semi-finalist standing, joined by commended classmates Judith Martowska, Susan O’Brien, and Joseph Petrie Jr.
-
Superintendent Taris Seeks to Curb Rising Costs of After-Hours School Building Use-September 4, 1981

Superintendent of Schools Louis J. Taris is pushing to rein in the surging volume of outside organizations utilizing school facilities during evening and weekend hours, citing mounting financial burdens on the school department. Dr. Taris informed the school committee that dozens of local organizations currently utilize school buildings after hours, frequently without paying any rental…
-
Norwood School Committee Votes Eliminate Youth Hangout-July 31, 1981

Following rampant vandalism, late-night drinking, and brush fires near Callahan Elementary School, the Norwood School Committee voted to fund a $6,000 clearing project to eliminate a notorious youth hangout.
-
School Committee Awards New Transportation Contracts-July 16, 1981

After a difficult budget cycle in 1980, the committee avoided controversy by budgeting accurately and selecting trusted local transportation providers.
-
It’s Time to Decide on Fate of Old High School-November 10, 1980

Facing Proposition 2½ and declining enrollments, Norwood school leaders are evaluating a 39-page NEASC report calling for urgent renovations to the high school, particularly its library media center.
Discover more from Norwood Historical Society
Subscribe to get the latest posts sent to your email.

