Tourist and Development Council Agrees to Pay Half of $33,000 Engineering Study for 200-Acre Route 1A Parcel and Connector Road

NORWOOD – Economic revitalization plans for the former Norwood Arena property received a major financial boost in November 1976 when the Norfolk County Tourist and Development Council voted to fund half the cost of a $33,000 professional planning and engineering study of the industrial tract off Route 1A. Reported in The Patriot Ledger on Friday, November 19, 1976, Franklin Swift—a member of the county council and chairman of Norwood’s Industrial Development Commission—confirmed that the county’s $16,500 matching grant placed the next step squarely on Norwood officials to appropriate the town’s matching $16,500 share.

Earlier that week, the Norwood Board of Selectmen had already inserted an article into the warrant for the December 13 Special Town Meeting seeking voter approval for Norwood’s $16,500 contribution, though Swift noted the town could alternatively fund its share via a general fund transfer approved by the Finance Commission. Once Norwood appropriated its half, the town would transfer the funds to Norfolk County, which would administer and pay the full $33,000 engineering contract.

The engineering study was designed to chart coordinated, industry-oriented development across more than 200 buildable acres in and around the old racetrack grounds, including evaluating a municipal proposal to build a new connector road linking Route 1 and Interstate 95 through the site to unlock commercial access between the two highways. Momentum for industrial redevelopment had accelerated after the board chairman of Faded Glory, a local jeans manufacturer, purchased the Norwood Arena site at public auction in August 1976 and unveiled plans in September for a 39-lot industrial park anchored by his own firm. Enabled by a recently enacted state statute allowing greater county participation in local economic development, the county grant capped three appearances by Swift over the past month before two council subcommittees. Calling the award the culmination of a lengthy effort, Swift urged town officials not to let the matching funds slip away: “The town would be very short-sighted not to take advantage of the $16,500 grant. It’s not an easy task to sell the county on something that has benefit only for the town of Norwood. But I guess we’ve done a good selling job.”

1976 Norwood Arena Planning Study Costs Adjusted to 2026 Dollars & Site Legacy

Inflation-adjusted using U.S. Bureau of Labor Statistics CPI data ($1.00 in Nov. 1976 ≈ $5.68 in 2026)

1976 Engineering & Planning Study Item 1976 Cost 2026 Equivalent
Total Norwood Arena Area Engineering Study $33,000 ~$187,440
Norfolk County Grant / Norwood Matching Share (Each) $16,500 ~$93,720
Site Today (2026): Located off Route 1A (Walpole Street) and Morse Street in South Norwood, the former Norwood Arena racetrack site was successfully transformed into a thriving commercial and light-industrial business park—today home to numerous offices, distribution facilities, fitness clubs, and corporate tenants.

Archival Note: This article has been dynamically reconstructed from the original public record print archives of the Patriot Ledger

More Norwood Arena Stories


Discover more from Norwood Historical Society

Subscribe to get the latest posts sent to your email.

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.