Selectmen Commission Fay, Spofford & Thorndike Study as Town Manager Walter A. Blasenak and Selectman Walter J. Dempsey Debate Water Revenues and MDC Contract Rules
NORWOOD – Officials of the Star Market Distribution Center on University Avenue appeared before the Board of Selectmen on Tuesday night, November 26, 1968, requesting permission to drill an industrial well capable of pumping 500,000 gallons of water per day to cool new refrigeration machinery planned for additions to the company’s existing warehouse complex. Reported in The Patriot Ledger on Wednesday, November 27, 1968, the proposal sparked immediate questions among town officials over groundwater impacts, regulatory jurisdiction, municipal water revenues, and Norwood’s supply contract with the Metropolitan District Commission (MDC).
Company representatives explained that while Star Market’s existing facility relied on air-cooled refrigeration units, groundwater offered greater cooling efficiency for the upcoming expansion. Under the company’s proposal, the pumped water would circulate through the refrigeration condensers and then be discharged back into the soil through drainage ditches on the low-lying University Avenue parcel to recharge the ground. Star Market officials also assured the board that denying the well permit would not generate additional municipal water sales, noting that the firm would simply stick with air cooling rather than purchase town water for refrigeration, while continuing to use Norwood town water for normal domestic and facility consumption.
Town Manager Walter A. Blasenak informed selectmen that both the Norwood Board of Health and the Massachusetts Department of Public Health appeared to hold partial regulatory jurisdiction over the well proposal. Blasenak also pointed out that one of the original justifications for extending municipal water mains to the University Avenue industrial site had been the expectation that Norwood would benefit from water revenues paid by the company—revenues the town would forego if Star Market relied on a private well for cooling.
That remark prompted a wry exchange with Selectman Walter J. Dempsey. “We don’t make any money on water, do we?” Dempsey asked, adding, “I thought water was a service sort of like cemeteries. Everyone uses both at one time or another and we’re happy if we can break even.”
Uncertain whether the Board of Selectmen even held legal authority to grant or deny well-drilling rights, the board voted to retain engineering consultants Fay, Spofford & Thorndike, Inc. to investigate how pumping 500,000 gallons daily might affect Norwood’s water table and municipal wells. Selectmen also agreed to consult the Metropolitan District Commission—Norwood’s wholesale water supplier—to determine whether a private industrial well of that scale would conflict with the town’s MDC water supply contract.
Archival Note: This article has been dynamically reconstructed from the original public record print archives of the Patriot Ledger
More Norwood Business History
-
Conservation Commission Faces Angry Residents Over Proposed Washington Street Auto Body Shop-August 8, 1979
Amid fierce opposition from South Norwood homeowners concerned over Hawes Brook flooding and pollution hazards, the Norwood Conservation Commission reviewed safety plans for a proposed auto body shop on Washington Street.

-
New Reliance Electric Service Center-July 17, 1979
Reliance Electric, which services and repairs industrial electric motors, will move its regional service center here from South Boston on Sept. 1. The new facility in a 19,000-square-foot location in the Park Place industrial development off Route 1 will employ some 30 persons, an increase of five over current levels. The company, with headquarters in…

-
Andrew Venskus Announces Closing of 33-Year Guild Square Jewelry Store Following Armed Robbery and Shootout-September 13, 1978
Andrew Venskus announces the permanent closure of Venskus Jewelers in Guild Square after 33 years following a violent armed robbery and shootout.

-
Norwood Park Place Industrial Park Advances-September 12, 1978
Norwood Planning Board releases $50,000 in performance bonding for the Park Place industrial park on Route 1 as roadway and building construction progresses.

-
Plans Unveiled to Revitalize Norwood Central Business District with Traffic Improvements-September 12, 1978
Consultants unveil a revitalization plan for Norwood’s central business district featuring traffic modifications, pedestrian amenities, and parking optimization.

-
Analog Devices Plans Major World Headquarters Expansion Into New 33-Acre Norwood Industrial Park-August 23, 1978
Computer equipment giant Analog Devices plans a 50,000-square-foot headquarters facility in a new 33-acre Route 1 industrial park, pending state and local sewer connection approvals.

-
John Shalbey Jr. Proposes Office Building Behind Ro-Jo Car Wash-August 9, 1978
Local businessman John Shalbey Jr. faced mixed reactions from David Terrace residents while seeking a zoning variance for an office building behind his Route 1 car wash.

-
South End Hardware: A Landmark Institution-July 5, 1978
In 1978, the Abdallah family’s South End Hardware in South Norwood stood as a testament to four generations of community service and local history.

-
LaRosa Brothers Step Down from The Village Inn after 15 Years-June 7, 1978
A beloved Guild Square culinary staple prepares for a structural transition as its founding brothers head toward retirement after a 15-year run.

Discover more from Norwood Historical Society
Subscribe to get the latest posts sent to your email.

