A significant development occurred in the stalled Park Place industrial complex on Route 1 in Norwood.

The board of health had some good news and some bad news for the developer, James H Shane of MJS Realty Trust.

The good news was that plans to install a leaching field and septic system for use until the state approves the park’s tie-in into the town sewer system would be acceptable.

However, temporary occupancy permits issued by Building Inspector John Grover on Friday were invalid, and the occupancy of a gymnastics school reportedly in operation was illegal. The board unanimously voted to accept the leaching field plans for study by Public Health Director Bartley King. King stated that he had to check the plans for detail but agreed with the concept and believed it was “the right approach” to the sewage disposal problem.

The state Department of Environmental Quality Engineering (DEQE) had denied permission to tie into the town’s sewer lines in May due to overburdened lines and excess water. Shane informed the board that tests were being conducted, which revealed leaks responsible for an additional 7,000 gallons of water per day entering the system. He stated that the groundwater level was low, and there was no question that the leaks were responsible for excess water in the system.

Shane expected state approval for permanent connection to the town sewer system once the leaks were repaired. The board also voted unanimously to ask the finance commission for funds to temporarily replace Public Health Nurse Marion O’Neil, who had been hospitalized on Sunday.

The Park Place complex was located on the site of the old Norwood Arena and consisted of 21 lots. Shane was developing the park under a family trust and was president of Appen-dagez Inc., his family-owned company that manufactured Faded Glory clothing. The company planned to move to Park Place, and Shane stated that 11 other buildings were planned for construction this year.

The delayed sewer permits had caused several construction timetables to be missed. Health board members Clare A Swift and Henry T McAuliffe expressed their anxiety to get the industrial park on the town’s tax rolls. Chairman Kenneth E Webber was on vacation at the time.

Archival Note: This article has been dynamically reconstructed from the original public record print archives of the Patriot Ledger

More…

  • Workers Begin PCB Cleanup At Contaminated Norwood Field-June 24, 1983

    As Senator Edward M. Kennedy and CDC Director William H. Foege slate a joint emergency inspection, local authorities organize free public blood testing at Town Hall.

  • Norwood Senior Citizens Log Impressive Mileage in Walking Fitness Program-August 14, 1982

    Sixteen Norwood seniors were honored by Recreation Director Robert Ivatts and William F. Butters for logging high mileage in a new walking fitness program.

  • John Shalbey Leads Community Drive to Clean South Norwood Railroad Bridges-July 29, 1981

    John Shalbey, president of Rojo car wash on Route 1, organized a community-backed cleanup drive for the Subway Hill and Dean Street railroad bridges in South Norwood.

  • Norwood Registry Office Closure-July 28, 1981

    The impending closure of the Norwood Registry of Motor Vehicles sparked swift backlash from local lawmakers, while town boards debated industrial park funding and hotel expansions.

  • Talk of the Town-July 20, 1981

    Discover more from Norwood Historical Society Subscribe to get the latest posts sent to your email. Type your email… Subscribe

  • Students Take Reins For Town Government Day-June 9, 1981

    School Committee Pledges Paint And Textbook Inventory To Student Delegates The utilitarian gray paint covering the walls of the Norwood High School cafeteria may soon be replaced with student-designed artwork following a successful session of the annual town student government day . High school students who were elected by their sophomore and junior peers to…

    Stack of textbooks including Algebra 1, History, Biology, English Literature, Chemistry, Physics, and Geometry on a school desk
  • The Issue Of Video Licenses-June 9, 1981

    In June 1981, Norwood officials crack down on incoming electronic amusement requests, fearing a “video fever” arcade atmosphere downtown.

  • Zoning Board Stalls Decision on Proposed $3 Million Caldor Shopping Center-August 20, 1980

    The zoning board delayed its decision on a proposed $3 million Caldor shopping center on Route 1 after discovering developers omitted a crucial traffic permit for Carnegie Road amid fierce local opposition.

  • Selectmen Split Over Amusement Game Permits at Sport Center and Local Restaurants-August 6, 1980

    In a close 3–2 vote, Norwood selectmen approved 10 electronic game machines at Norwood Sport Center after concerns about creating a “penny arcade” atmosphere. A similar request from Papa Gino’s for a single Space Invader machine was denied, with officials distinguishing between recreation‑based and dining‑based establishments.

  • Nassau Gardens Residents Form Nonprofit Housing Cooperative and Purchase Complex-August 17, 1979

    Nassau Gardens tenants launched a subscription drive to purchase their 204-unit Route 1 apartment complex through a nonprofit housing cooperative backed by a $4 million HUD agreement.


Discover more from Norwood Historical Society

Subscribe to get the latest posts sent to your email.

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.