Board Forwards Dr. William F. Lovell’s 25-Duplex ‘Blueview Estates’ Proposal and Robert A. Cofsky’s 13-Home Subdivision to Town Engineer While Addressing Ernest Boch Subaru, Cornetta’s Iron Horse, and Longmeadow Road Complaints

NORWOOD – Preliminary plans for two residential subdivisions—one bordering Nahatan Street and West Border Road and the other connecting Dean Street to Edgehill Road—dominated a wide-ranging session of the Norwood Planning Board on Monday night, November 27, 1972, alongside zoning line disputes along Route 1 and resident complaints over an unfinished subdivision street. Reported in The Patriot Ledger on Tuesday, November 28, 1972, the meeting brought property owners, local business operators, and frustrated homeowners before planning board members Chairman Francis Wisgirda, Thomas A. Riolo, and Thomas F. Cavanaugh.

First on the agenda was Donald Ryan of Peabody, brother-in-law of Norwood resident Dr. William F. Lovell, who outlined preliminary plans to construct 25 duplex homes on Dr. Lovell’s tract bounded by Nahatan Street and West Border Road. Previous efforts by Dr. Lovell to rezone the parcel for a shopping center or commercial office-and-retail complex had been defeated at Town Meeting. To be named Blueview Estates, the residential project was designed around a circular roadway entering from West Border Road, bordering town-owned elderly housing and another municipal parcel used for winter skating known as Hartshorn’s Swale. Because the tract was already zoned for general residence, no zoning change was required. On a motion by the three planners, the board referred the plan to Town Engineer Robert A. Hamilton, who indicated he would submit his report within a month, after which Dr. Lovell would file a definitive plan alongside a report from the Board of Health.

Planners also forwarded to Engineer Hamilton a preliminary plan submitted by Robert A. Cofsky of Norwood to construct 13 single-family homes along a new street connecting Dean Street to Edgehill Road. Cofsky noted that 10 of the proposed lots were large enough to accommodate duplexes and that sewerage and drainage systems would tie into existing lines on Edgehill Road. Hamilton expected to complete his engineering review within a month.

The board next met with business owners along the east side of Route 1 between East Cross Street and Dean Street, who sought to extend the existing manufacturing zone deeper into the adjacent general residence district. Hamilton explained that the businesses had lost 15 feet of frontage during a state road-widening land taking, leaving several structures and storage yards in technical violation of zoning setbacks—which required a 50-foot grassed buffer strip plus an additional 25-foot storage-only strip where buildings were barred. Wisgirda initially suggested extending the manufacturing zone by 60 feet over a town sewer easement, while trucking company owner Robert Polito urged following existing property contours, warning of “a battle” with neighboring residents over any boundary shift. Hamilton cautioned that Cofsky’s proposed Dean Street-Edgehill Road housing development nearby could intensify neighborhood opposition. Measuring the map with his ruler, Wisgirda concluded that only 10 feet could be added behind Ernest Boch’s Subaru automobile dealership, meaning a zoning variance would still be needed where a former boat dealership building straddled the boundary. Nearby Cornetta’s Iron Horse restaurant already held a parking variance. Business owners agreed to gather neighborhood signatures and return in two weeks alongside abutting residents from Weston Avenue (garbled as “Westron Etna” in OCR).

Residents also pressed the board over incomplete subdivision infrastructure. Five homeowners from Longmeadow Road protested the deteriorated condition of their roadway. “This is our third winter without a street,” declared Mrs. Marion DiCalogero, while neighbor Donald Sisk added, “I’ve lost two mufflers,” noting that complaints to developer Ronald Cieri had gone unanswered. On Riolo’s motion, planners voted to summon Cieri to a meeting in two weeks and examine his performance bond to determine whether his construction deadline had expired. Separately, the board denied a bond release requested by developer William Flaherty for Jacobsen Drive and Bornewood Drive after Hamilton cited unfinished work and discrepancies involving catch basins, stone bounds, street signs, and sidewalks. Finally, lacking copies of the prior year’s budget, planners postponed action on their 18-month budget until their next meeting.

(Note: Multi-column newsprint OCR transpositions across page 10—where lines from the Planning Board session interleaved with three adjacent Norwood briefs—have been cleanly reassembled into standalone stories.)

Source: The Patriot Ledger • Tuesday, November 28, 1972

From The Patriot Ledger Clipping (November 28, 1972)
“This is our third winter without a street.” — Mrs. Marion DiCalogero
“I’ve lost two mufflers.” — Neighbor Donald Sisk
— Longmeadow Road Homeowners, addressing the Norwood Planning Board regarding developer Ronald Cieri’s unfinished roadway
25 Duplexes
Dr. William F. Lovell’s “Blueview Estates” Plan
13 Homes
Robert A. Cofsky Dean St.–Edgehill Rd. Plan
15 Ft. Lost
Route 1 Frontage Taken During Highway Widening
Location Map: Nahatan Street & West Border Road, Norwood, MA
Notable Officials, Developers & Residents Mentioned:
Francis Wisgirda, Thomas A. Riolo & Thomas F. Cavanaugh Town Engineer Robert A. Hamilton Dr. William F. Lovell & Donald Ryan (Blueview Estates) Robert A. Cofsky (Dean St.–Edgehill Rd.) Robert Polito, Ernest Boch Subaru & Cornetta’s Iron Horse Mrs. Marion DiCalogero, Donald Sisk & Ronald Cieri William Flaherty (Jacobsen & Bornewood Drives)
Share Your Norwood Memories: Do you remember winter skating at Hartshorn’s Swale near West Border Road, dining at Cornetta’s Iron Horse on Route 1, or growing up on Longmeadow, Jacobsen, or Bornewood Drives in the 1970s? Share your memories in the comments below.

Archival Note: This article has been dynamically reconstructed from the original public record print archives of the Patriot Ledger

  • 1923 Planning Board Report-Existing East-West Through Streets and Diagonals

    1923 Planning Board Report-Existing East-West Through Streets and Diagonals

    When the main thoroughfares of Norwood were laid out a century or more ago for a convenient approach to fields and pastures and to connect knots of houses or villages with one another, less continuity was secured in the east-west routes than the north-south. As the north-south streets served to connect Boston with Providence and…

  • 1923 Planning Board Report-Proposed Additional East-West Through Streets and Diagonals

    1923 Planning Board Report-Proposed Additional East-West Through Streets and Diagonals

    In the wide interspaces between the existing east-west thoroughfares there are many local streets already built, and many more contemplated or actually under construction. Gradually, in a long term of years, all these wild lands will be traversed by roads as the population of the Town increases. These roads will be built by private initiative…

  • 1923 Planning Board Report-Existing North-South Through Streets

    1923 Planning Board Report-Existing North-South Through Streets

    The existing through streets of Norwood, as shown above, were laid out in times before the construction of the steam railroads, before the large industries were established, and, of course, long before the development of modern housing and the beginnings of motor vehicle transportation. These through streets belong to the epoch of the chaise, the…

  • 1923 Planning Board Report-Proposed Additional North-South Through Streets and Diagonals

    1923 Planning Board Report-Proposed Additional North-South Through Streets and Diagonals

    In the outlying districts of the Town where new houses and new streets are springing up, the individual land owners have used and are still using customary skill and foresight in the planning of individual lots to meet the desires of house builders and to make the lots accessible from the local streets of these…

  • 1923 Planning Board Report-Development of Clark Swamp District

    1923 Planning Board Report-Development of Clark Swamp District

    The built-up area of Norwood is gradually approaching the margins of the Clark Swamp district. Under good or bad planning this entire neighborhood is destined to be crossed by streets and built up with dwellings. The cost of this work will be borne inevitably by the citizens of the Town. If good planning is applied…

  • 1923 Planning Board Report-Schools, Parks and Playgrounds

    1923 Planning Board Report-Schools, Parks and Playgrounds

    On the accompanying map are shown the public schools of Norwood. They are grouped most closely near the center of the Town with scattered buildings on the outskirts. Evidently school locations will follow the centers of new growth, but the extent to which these structures will be scattered depends upon the policies adopted in the…

  • 1923 Planning Board Report-Streets Near Norwood Railroad Station

    1923 Planning Board Report-Streets Near Norwood Railroad Station

    In the course of the general program of the state for the abolishment of railway grade crossings, the present dangerous crossing at Railroad Avenue will be abolished. This work should be undertaken, however, not only with an eye to the safety of persons crossing the tracks, but with consideration of adequate communication across the Town.…

  • 1923 Planning Board Report-Vicinity of High Bridge

    1923 Planning Board Report-Vicinity of High Bridge

    The complicated and dangerous arrangement of roadways, railway tracks for electric and steam cars, in combination with a narrow underpass in the High Bridge district illustrates forcibly the costly results of allowing important road junctions to “happen by chance.” It is true that these junctions were created at a time when traffic in this neighborhood…

  • 1923 Planning Board Report-Plan For Parkway

    1923 Planning Board Report-Plan For Parkway

    Discover more from Norwood Historical Society Subscribe to get the latest posts sent to your email. Type your email… Subscribe

  • Planning Board Records Remain Largely Missing After Eighteen Months-July 18, 1991

    Planning Board Records Remain Largely Missing After Eighteen Months-July 18, 1991

    Minutes from 1973 to 1983 remain missing, complicating the town’s ability to track official votes and planning decisions from that era.


Discover more from Norwood Historical Society

Subscribe to get the latest posts sent to your email.

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.